ru en
Русский | English
shopping_cart

Installation of an interior door and its nuances

Performing the installation of the door in a professional way becomes a guarantee of its long operation, even if we are talking about cheap doors. Unprofessional execution of such works usually brings the main problems that require a radical solution and even replacement. Every buyer should know about how the installation is done in the main stages – such knowledge will allow you to control the work of installers, watching them.

монтаж межкомнатных дверей инструкция

You can note 3 stages, starting from the preparation, then to the installation itself, and to the delivery of the work that was performed.

Installation of interior doors instructions

The arrival of the master must be carried out on time, according to the agreement, the first thing he must do is to check the volume of work and the list of their types according to the act. Mechanisms and materials in their quality and quantity should also be checked before work. The master checks and inspects the canvas, evaluates its quality. Fasteners and tools are prepared for work, the room is protected from dust, workers wear protective suits.

Installation

Installation of arches, interior solutions begins with the sorting of products and materials with an orientation to the doorway, with the approval of the side in which the door will be opened. The old system is subject to dismantling, the installation of the new one begins with marking, tapping into the hardware box. The box is assembled according to the desired width, the opening is narrowed and expanded if necessary. The box is fixed with wedges, then with mounting foam, anchors. The lock is cut into the box, the door frame is put, the platband, when using different technologies of fastening elements. Joints that are left in plain sight can be filled with sealants, wax for furniture.

монтаж межкомнатных дверей

Steel structures

The process of installing a steel door looks somewhat different. After checking the configuration, the system elements are lifted to the floor, and accessories and materials are sorted. The old one should be removed, the openings should be measured for maximum accuracy. The inner cavity of the box is filled with foam, the box is placed in the opening, attached to the anchor. The necessary accessories are placed on the canvas, and the canvas itself is attached to the box. The mechanisms are checked in the open state, the mating part of the box is leveled, and plugs are placed on the anchor holes. The space between the wall and the box is filled with foam, before that the surfaces are protected from contact with it. The finishing element is put, the tile is laid, the platband is mounted, the joints are filled with wax or sealants.

PVC solutions and their installation

Sorting and distribution of materials by openings. Removal of old structures and subsequent processing of the opening with the removal of poorly fixed particles. The elements must be prepared for manipulations, marked along the opening. In the windows, the system itself and the drain are installed, then double-glazed Windows, sashes. The frame is placed under the finish, the openings are sealed, the window sill is placed, and the cavity itself is sealed. The vapor barrier is provided with a sealant, decorative and regulating elements are put. It remains only to remove the protection and debris.

The process of delivery of works

The installer must provide the result and list what was done in accordance with the act. The act is signed with the customer, there must be 2 copies. All the garbage is removed in the container, the warranty obligations are explained, and one of the two documents is handed over to the customer.

Now you know how the work is done and can control this process.


Pub date: 2021.06.01